Milan (MI), Italy (IEC)
Automation of the testing process of MT pumps from 6 to 10MW with scheduling of test values and issue of product quality reports.
Electrical engineering and automation including the supply of electrical panels for the test room consisting of a single test bench.
Siemens
System completely destroyed in the profinet network through the connection to 4 ET200SP distrubute peripherals, 1 supervisor on TIA Portal platform and interfacing with high frequency DAS system (data acquisition system). The physical I / O points managed are over 850.
Control, monitoring and scheduling in real time of all the physical quantities used in the centrifugal pump test phase. Processing of all scheduled data during the control processes and automatic issue of test reports.