CONTACTS +390547323336 | info@righielettroservizi.com

Ship loading / unloading pumps – Abu Dhabi National Oil Company

Ship loading and unloading pumps – ADNOC

Country and reference standards

United Arab Emirates (IEC)

Project

Port oil loading and unloading system on ships

Description of the supply

Software development and pump skid control panels. Development of the plant management system consisting of 8 loading pumps and 8 discharge pumps via Operator Stations (SCADA).

Technology used

Siemens

Distinctive elements

S7-400HF architecture (FAIL SAFE) redundant for the control of each individual pumping skid and management of the communication network between the various intelligent system controllers via the PROFISAFE system.

Customers benefits

Maximum flexibility and total independence on every single pumping system with communication network in PROFISAFE